Views: 176 Author: Site Editor Publish Time: 2024-03-15 Origin: Site
Wastewater Type | Industrial waste |
Implementation time | |
Processing scale | 200m3/h |
Project name | Suma Park North Wastewater Treatment Plant Project |
Product name | RDAF High Efficiency Dissolved Air Flotation |
Process |
Anhui Suma Park North Wastewater Treatment Plant Project is located at the north end of Chujiang Avenue in Suma Modern Industrial Park, Suzhou City. The total construction scale of the project is 60,000 m³/d. After the project is fully completed, it can treat 60,000 tons of waste (sewage) water per day, reduce chemical oxygen demand by 8,640 tons and ammonia nitrogen by 648 tons per year, which is of great significance to the water environment protection of the region and the Huaihe River Basin.
This project adopts a C-AAO combined biochemical pool + micro-flocculation filtration process, and the drainage implements the urban Class A standard. After the raw water is treated with high-efficiency dissolved air flotation, more than 90% of SS is removed. After the suspended solids concentration is reduced, the treatment load of the combined biochemical pool can be reduced, and the treatment efficiency can be improved.